Your utility
Solar with Tampa Electric
Your power company decides more about a solar project than most homeowners expect. Interconnection, billing treatment, and which financing structures work all come down to which utility serves your address.
Get My Free AssessmentWhat TECO controls
About 2,000 square miles of West Central Florida: Hillsborough County and parts of Polk, Pasco and Pinellas County. Solar rules here are set by the Florida Public Service Commission.
- Tampa Electric is an investor-owned utility with its own interconnection process and program rules.
- As with every Florida territory, net metering is a billing arrangement rather than a cheaper rate.
- Program rules, rates and terms are set by the utility and by regulators, and can change.
Where TECO serves
About 2,000 square miles of West Central Florida: Hillsborough County and parts of Polk, Pasco and Pinellas County. Here is the territory by county.
About 2,000 square miles of West Central Florida
Tampa Bay
- Hillsborough CountyTampa
- Polk CountyParts of the county
- Pasco CountyParts of the county
- Pinellas CountyParts of the county
Source: Tampa Electric, Vital Statistics.
We work throughout TECO territory
If your home is served by Tampa Electric, we can review it. These cities have their own page; the rest of the territory works the same way.
Not sure this is your utility? Compare every utility we work with.
TECO and solar: common questions
- Does net metering with TECO give me a cheaper electricity rate?
- No. Net metering is a billing arrangement, not a rate plan. Energy your system sends to the grid is credited against energy you draw from it. The price you pay per kilowatt-hour does not change because you have solar. Anyone describing it as a cheaper rate is describing it wrong.
- Will I still get a bill from TECO?
- Most solar customers continue to receive a utility bill. What it contains depends on your usage, system design, interconnection, applicable rates, and program rules. Your account stays connected to the grid unless the system is designed otherwise.
- How long does TECO interconnection take?
- Timing is controlled by the utility, not by the installer or by Nova Structa. It depends on the application, inspections, and the utility's own queue, and it varies.
- Are lease or financing options available in TECO territory?
- Financing and lease availability depend on provider criteria and project economics, and are confirmed during the assessment.
- Can TECO change its solar rules?
- Yes. Rates, net-metering terms, interconnection requirements, and program rules are set by the utility and, for investor-owned utilities, by state regulators. They can change, which is one reason no savings figure can be guaranteed.
Review your options in TECO territory
Get a free assessment. We start with your actual utility bill, not an average.
Savings and utility-bill examples shown are illustrative only, are not guaranteed, and may not reflect typical results. Actual savings depend on your energy usage, system size, roof and site conditions, financing terms, utility rates, net-metering rules, and other factors specific to your home.
Financing, where available, is provided by third-party financing providers and is subject to credit approval. Rates, terms, fees, monthly payments, total cost, and any security interest or filing are set out in your financing agreement. “$0 down” describes the initial payment structure only and does not mean the system or services are free.
Installations are performed by independent Florida licensed contractor(s). Nova Structa does not perform installation work.